Report in the months of April to June 2010
For Kitchen & Dining Hall:
-
Alluminium fabrication works – Partition for
Dining Hall office (one side), partition of wall for vessels store room,
door between Kitchen and Dining Hall and Ventilation has been completed.
-
All the doors and windows have been fixed.
-
Tables and Chairs have been purchased for Dining
Hall.
For Accommodation:
Prayer Concerns:
-
Pray for God’s wisdom and knowledge, also for my health so that I will
able to continue His Missions.
-
Pray for the Salvation of all the workers so that they may believe in
Jesus Christ.
-
Pray for the safety of all the workers as well as myself and Vijay.
-
Pray for the Funds so that we can complete the building.
Report in the months of
February & March
2010
For Kitchen & Dining Hall:
-
Plastering is completed. Laying of roof tiles in
front side slope roof and other sides is completed.
-
Painting is almost
completed as there is some patches works remaining.
-
Fixing of Water closet, Wash basin is completed
and fixing of Urinal is remaining. Inlet connection to overhead water
tank, inter-connection of twowater tanks is also completed. Some of
water Tabs are fixed and Sinks are also purchased. External Plumbing
like laying waste pipe to septic tank, construction of Manhole is completed.
-
All the electrical works are completed except
power connection from Generator room.
-
Stone cladding of Front side and West side
Elevation works is almost completed.
-
Vitrified Tiles flooring in Dining Hall,
Polished Kota stone Flooring in Kitchen and Ceramic Tiles Flooring in
Toilet and Hand Wash area is completed. Tandoor Floor tiles are laid in Front Verandah
and for steps, Yellow Tiles and Red Tiles are used.
-
Aluminum partition of Toilets is completed.
-
Fixing of Doors is almost completed as painting,
fixing glass is remaining in some doors, all the windows are fitted with
glass and it is completed. Curtain rods and its brackets are also fixed.
-
Wall Tiles in Kitchen portion, Hand wash area
and Toilets is completed.
-
Rain water outlet pipe is fixed.
For Accommodation:
-
Roof for first Floor (slab) has been laid.
-
Almost all the Brickworks are completed in
Ground floor.
-
Plastering work is almost completed, some
patches works and second coat is remaining.
-
Fixing of Doors and Windows frames are in
progress.
-
Electrical works is in progress, wall cutting,
laying of PVC pipes in walls, metal Box for switches is in progress.
Prayer Concerns:
-
Pray for God’s wisdom and knowledge for me to do my works well.
-
Pray for the safety of the workers as well as myself and Vijay.
-
Pray for the Funds so that we can complete the building.
Report in the month of December 2009
-
Kitchen & Dining Hall construction: Plastering (two
coats), elevation works for verandah, making slope roof,
making architectural design, electrical works, plumbing
works is in progress. Roof for front verandah, staircase
is completed.
-
Family Accommodation construction: Rising of column for
1st floor, centering and shuttering of 1st
floor beams and slab is in progress. Brickworks are also
going on.
-
Gas station works for Kitchen is going on, visited
SAIACS and FMC buildings in Bangalore to see the
Kitchen, room arrangements.
Prayer Concerns:
Report in the month of November 2009
-
Worked on completing the work of Kitchen & Dining Hall’s
Brickworks, Plastering, elevation works for verandah,
making slope roof, making architectural design,
electrical works, & plumbing works.
-
Family Accommodation construction: Laying of cement
concrete slab (roof) Ground floor is completed.
-
Working on budget of construction of Gas station for
Kitchen, Requirement of Chimney for Kitchen and
Fabrication works for Toilet, Dining Hall office is also
worked out.
-
I thank God for opening
His Mission works in other ministries and get connected
with other leaders.
Pray for:
Report in the month of October 2009
-
Kitchen & Dining Hall construction – Brickworks for
outside walls and internal walls is in progress.
-
Family Accommodation construction – Shuttering &
centering of slab for 2nd, 3rd & 4th
block is completed.
-
I thank God for His protection though sometimes I am
struggling with health problems I can resume the works
by God's Grace.
Prayer Concerns:
Report in the month of September 2009
Family Accommodation construction:
shuttering & steel works, laying of ground floor slab has
been completed for 1st block. Shuttering of
slab for 2nd and 3rd block is in
progress and brickwork also started for walls.
Readings of Wind data logger has been sent to the company
through Mr. Adam Allard.
I thank
God for His wisdom pour upon me to handle the works
without much difficulty.
Please pray for:
-
Needed fund for the Vision City.
-
The safety of workers and God’s
wisdom upon all of us.
-
The works will be completed as
soon as possible.
Report in the month of August 2009
-
Working on the
construction of Kitchen & Dining Hall construction.
Shuttering, centering & laying steel reinforcement of
roof beam and slab is in progress.
-
Family Accommodation
construction: Plinth Beam, laying of Cement concrete for
Flooring, Stone works & back filling for Corridor,
Raising Column for Ground floor slab has been completed.
-
Construction of Parking
Shed, and Renovation & repairing works are done.
-
Readings of Wind data
logger has been sent to the company through Mr. Adam
Allard.
-
I encouraged by ongoing
Vision City Construction, I really thank God for His
guidance in everything.
Pray for:
Report in the month of July 2009
-
Kitchen & Dining Hall construction
– Raising column, plain cement concrete flooring,
shuttering & centering for roof beam and slab is in
progress
-
Family Quarter construction –
Stone works, R.C.C & Steel works for the plinth beam, back
filling is in progress
-
Rain harvesting works, making of
water channel, connecting pipes to the water tank for
collecting rain water.
-
Construction of Library room.
-
Readings of Wind data logger has
been sent to the company through Mr. Adam Allard.
Please Pray for:
-
The funds for Vision City.
-
The safety of workers and God’s
wisdom upon us.
-
The works will be completed as
soon as possible.
Report from January to June 2009
-
Rising of North side compound wall by 3 foot & Barbed
wire fencing is been done.
-
Shifting of Agriculture power line to Industrial High
Tension line has been done.
-
Publishing of Tender notice for construction of Kitchen
& Dining Hall and Family Quarter.
-
Construction of Vision City building has been started.
-
Construction of Vehicles Parking Shed near Generator
room has been done.
-
Readings of Wind data logger has been sent to the
company through Mr. Adam Allard.
Pray
for:
-
The
safety of workers since they are working in hot sunlight,
there is a possibility of getting sunstroke etc. also
other harmful things like snake and scorpion bitten.
-
Progress of Vision City so that the contractors can
complete in a specified time.
-
God
wisdom on Contractor people and Site Engineer of Vision
City.
Report in
the month of December 2008
-
Transformer yard fencing has been done.
-
Construction of toilets for labour work is in
process.
-
Raising of Compound wall (North side) with angle
Iron for fencing work is in process.
-
Preparation of BOQ, structural design etc. for
Vision City work is still going on and to be completed
before 15th January, 2009.
-
I went to my native place for Christmas vacation,
and I was very much encouraged by Church members by
praising and welcoming me since I am a Christian
Missionary.
-
Pray for the Funds need to be raised for Vision City
Construction.
-
Pray for Vision City Construction which is supposed
to start soon.
-
Pray for works going on such as Compound wall,
shifting electric poles and tender calling for Vision
City Construction.
Report in
the month of November 2008
Worked for the Connection of 3-phase current in
Transformer.
Installation of meter box in Transformer.
Met
with IMA Chairperson regarding architects for Vision City.
Appointed letter given to Architect for Vision City.
Met
with Legal adviser for Vision City
I
really encouraged in seeing some labors are really
talented in their works of field. So as a mission worker
we really need to concentrated and putting our hearts in
what we do.
Pray
for funds needed in Vision City Construction.
Pray
for Vision City Construction starting soon.
Pray
for wisdom of Site Engineer to look after the construction
works.
Report in the month of October 2008
-
Met Dr. Kamala Chiranjeevi & Mr. Santa Kumar (Seva
Bharat) for selecting Architect for Vision City
Construction.
-
Met Architect Mr. N. Anand in ECIL and Mr. Jasper
Dawson through E-mail and took their fees terms and
conditions.
-
Met Advocate Mr. Nirmal Kumar and Mr. Vikranth Kumar
and went to Secunderabad court for legal adviser of Visio
City Project, IMA.
-
Had Site Visit of Mr. Prasana Kumar (Architect) on
going & completed projects, and It’s a great thing that
some of the project s done by the architect Mr. Prasana
kumar, it’s really impressed me as he has done excellent
job.
-
Pray for good architect, & building for construction
projects.
-
Pray for all the legal procedures to be done for
Vision City.
-
Pray for the funds to be raised.
|